TIMBER ROOFTOP EXTENSION: HOW TO ADD A STOREY?

Francesco Loconte, architect · November 2026

Terrasse de la surélévation et ses baies vitrées, La cabane à histoires à Montreuil, KIDA

The terrace of La Cabane à Histoires, Montreuil. Photo Alexis Pichot

In Montreuil, a townhouse needed one more bedroom. We found it under the roof.

By changing the pitch of the south-facing roof slope, we opened up the space to fit in this bedroom. The new volume is set back from the façade. This setback leaves room for a timber terrace above the street. From there, the view stretches 160 degrees over the rooftops and the trees.

The windows and railings follow the proportions of the existing windows. Inside, curved partitions hide the staircase and storage. They draw the eye outwards. The structure was designed with Antei Structures, and the work was carried out by Kopac.

Chambre blanche sous les toits de la surélévation, La cabane à histoires à Montreuil, KIDA

The bedroom under the roof, La Cabane à Histoires. Photo Alexis Pichot

This is called a rooftop extension. You build on top of the existing house, without moving out and without taking space from the garden. Before drawing anything, we always start with the same questions.

Can the house carry an extra storey?

Only a structural engineer can tell. They check the foundations and the condition of the load-bearing walls, and calculate how the weight of the new storey will be carried down to the ground. A soil survey (known in France as G2) is sometimes added. These studies come first.

This is where timber has an advantage. It is light. On an old house, it often means the original walls and foundations can be kept. The walls and floors are prepared in the workshop, then assembled on site, so the roof stays open for less time. At La Cabane à Histoires, the timber structure rests on the house's load-bearing walls.

Façade de la maison de ville surélevée, La cabane à histoires à Montreuil, KIDA

La Cabane à Histoires, Montreuil. Photo Alexis Pichot

Do you need a permit to build upwards?

The local council has its say. Its local plan sets the permitted height and the distances from neighbours, and sometimes dictates the shape of roofs. Near a listed monument, the Architecte des Bâtiments de France (the heritage architect) also gives an opinion. We read these rules before we start drawing.

The type of approval depends on the floor area created. In an urban zone of a municipality covered by a local plan, a prior declaration is enough up to 40 m². Beyond that, you need a building permit. Outside urban zones, the threshold drops to 20 m². If the house exceeds 150 m² of floor area once the work is done, a permit is required from 20 m² created, and an architect then becomes mandatory.

The town hall has one month to respond to a prior declaration and two months for a detached-house permit. Allow one extra month if the Architecte des Bâtiments de France is consulted.

How much does a timber rooftop extension cost?

The price depends mainly on what you expect from the new storey. A bare room under the roof structure does not cost the same as a finished bedroom with its staircase and shower room. The existing structure also matters: the sounder it is, the less reinforcement it needs.

La Cabane à Histoires was completed in 2020. It covers 60 m² and cost €160,000 excl. VAT in construction work. Architect's fees come on top; we explain them in How much does an architect cost in Paris?

As for timing, it takes several months before work starts on site. They are used for studies, design, the application and its review by the town hall. The building work itself is shorter, because the structure arrives already prepared.

How does the project work with us?

It all starts with a visit. We look at the house as it is lived in, and at what one more storey would look like.

Next come the structural studies and a review of the rules. Then we design the project with you, up to the application filed with the town hall. While it is being reviewed, we consult contractors. On site, we oversee the work through to handover.

And if you don't need to go up?

When the garden allows, you can also extend at ground level. For D’un pas à l’autre, Isabelle wanted a place of its own for her daughter. We set a timber volume in the garden, linked to the house by a glazed gallery. When the plot is narrow, or the garden matters a lot, it is better to build upwards.

Sometimes the extra floor already exists under the roof. At Les Oiseaux de Montmartre, Kim and Sergio had bought three former maids' rooms just above their apartment. We rebuilt the whole roof structure to turn them into a proper living level. A five-square-metre terrace looks out over Paris.

Before building upwards, we always look at what the roof already holds.

See also 

La Cabane à Histoires – Surélévation d’une maison de ville
D’un pas à l’autre – Extension d’une maison individuelle
Les Oiseaux de Montmartre – Appartement en duplex
Double (H)Auteur – Rénovation d’une maison de ville

CONTACT

francesco@kid-a.fr

MEET

42 rue Sedaine

75011 Paris (FR)

FOLLOW

Instagram

LinkedIn

POLICY

Privacy

Cookie

CONTACT

francesco@kid-a.fr

MEET

42 rue Sedaine

75011 Paris (FR)

FOLLOW

Instagram

LinkedIn

POLICY

Privacy

Cookie